Tuesday 3 March 2009

Week 4 - 25th Feb - 3rd March

Validating the Interactive Media Product

Unfortunately, I had a set back due to my own stupidity this week. While developing the web layouts in Photoshop before transferring images into Dreamweaver, I flattened the psd. Thankfully this gave me an opportunity to improve some aspects of the design I previously overlooked.

With a completed design working in the latest and Firefox browsers across Mac and PC, I looked into improving Search Engine Optimisation (SEO). After reading several journals and tips about SEO, I found out that by validating your website would go towards improving the ranking.

In order to test the site, I uploaded the HTML to http://validator.w3.org/ I found several minor problems that needed fixing before it would validate. In no time at all I validated the HTML strict 1.0 and CSS2.1.

25th Feb
Problem with images and foolishly flattened the original artwork my mistake

26th Feb
Looking at tips to improve SEO
One tip was to validate the website

27th Feb
Website Development

28th Feb
Validating problems fixed



No comments:

Post a Comment